Conveyor Owner's Manual


GrainWay bin equipment attaches to new or existing bins and works with the GrainWay conveyors. Installation of the bin equipment is simple and straight forward. The bin equipment works with new or existing construction.


GrainWay bin equipment attaches to new or existing bins and works with the GrainWay conveyors. Installation of the bin equipment is simple and straight forward. The bin equipment works with new or existing construction. In most grain bins, the aeration floor is left in place. On average, the installation takes 3 to 4 hours in a 30’ grain bin. The 6 installation steps are shown below.